PLAN

One architecture instead of a collection of devices.

Display, camera, audio, control, collaboration platform and network designed as a single environment, documented for delivery and support.

Executive boardroom with integrated display, table connectivity and control panel

The business problem

When each subsystem is procured separately, integration risk moves to the customer. Interfaces, signal paths, power and network dependencies are discovered on site, during installation, at the worst possible moment.

Expected outcome

A buildable, reviewable design where every dependency is visible before installation begins.

What PTNTI does

  • System architecture and signal flow design per room typology
  • Technology category selection based on the design, not on stock
  • Coordination with interior, electrical, mechanical and IT disciplines
  • Cable schedules, rack layouts and connectivity documentation
  • Control and user-experience design for consistent room operation

Deliverables

What you receive.

System architecture and signal flow drawings
Bill of technology categories and quantities
Integration and coordination documentation
User experience and control specification

Delivery method

The same process, applied consistently.

  1. 01

    Discover

    Understand users, rooms and requirements.

  2. 02

    Design

    Create system architecture.

  3. 03

    Integrate

    Coordinate audio, video, display and infrastructure.

  4. 04

    Commission

    Configure, test and validate.

  5. 05

    Train

    Help administrators and users operate confidently.

  6. 06

    Support

    Maintain performance throughout the lifecycle.

Related solutions

Where this service is typically applied.

FAQ

Common questions about this service.

We design around requirements first, then select from the technology partners that best fit the room, platform and support model.

Start a conversation

Planning a new workplace, meeting room or collaboration environment?

Talk with PTNTI about your users, rooms, technology environment and project requirements.